Your browser does not support script

Red Cliff Property

 

Montrose Significant Drill Hole Intersections

Assay results greater than 1 g/t gold for the 2007 drilling on the Montrose zone are listed below:

DDH From (m) To (m) Width (m) Au (g/t) Ag (g/t) Cu (%)
Mon-1 145.58 146.04 0.46 2.16 11.40 0.10
and 199.30 200.91 1.61 16.61 31.40 1.10
including 200.30 200.91 0.61 40.12 67.50 2.54
CT-2 236.89 239.94 3.05 1.52 0.70 0.03
CT-3 166.77 179.57 12.80 2.75 1.78 0.11
including 169.82 172.87 3.05 9.22 1.90 0.05

Widths of the drill intersected zones are unknown at present but historical work indicates that zones are at least 4 meters wide in underground workings and surface trenching.

In June to November 2009, Decade Resources Ltd. completed a total of 5,227.49 meters of drilling in 36 holes on drill roads and drill pads constructed during the field season. Drilling tested the Montrose zone in three areas, namely north of the previous mining activities in Lydden Creek, in the Lydden Creek canyon just west of the previous mining activities and along the possible south extension. Drilling extended the zone well below the lowest working as well as indicating that it extends to the north from the adit in Lydden Creek. In addition, drilling intersected a wide zone of intensely silicified and pyritic rocks to the west of the Montrose zone.

Drill Hole From To Interval AU g/t
Mon-2009-1 29.98 62.5 32.52 7.53
Including 35.77 38.72 2.95 14.89
including 59.6 62.5 2.9 45.77
Mon-2009-2 57.62 106.1 48.48 4.17
Including 100 106.1 6.1 13.32
Mon-2009-3 46.04 53.96 7.93 3.1
and 74.39 102.74 28.35 7.3
including 93.6 97.26 3.66 24.05
Mon-2009-4 22.17 60.06 28.41 5.78
Mon-2009-5 38.72 78.35 39.63 4.75
and 87.5 96.18 9.15 1.67
Mon-2009-6 53.66 108.84 55.18 9.64
including 53.66 78.36 24.7 20.87
including 53.66 57.32 3.66 38.71
including 69.36 71.49 2.13 142.2
Mon-2009-9 9.15 15.85 6.71 4.98
and 36.28 39.33 3.05 1.24
and 42.38 57.62 15.24 5.69
Mon-2009-10 7.16 13.11 5.95 2.15
and 42.99 57.62 14.63 1.89
Mon-2009-11 191.01 203.66 12.65 5.27
LP-2009-2 126.52 129.57 3.05 2.49
LP-2009-4 147.25 151.22 3.97 2.94
LC-2009-8 61.74 62.2 0.56 3.31
and 74.7 77.74 3.05 1.54
LC-2009-9 35.06 41.16 6.1 2.21
including 38.11 41.16 3.05 3.15
and 43.29 44.33 1.04 1.34
LC-2009-10 35.06 38.11 3.05 2.05
LC-2009-16 24.39 24.69 0.31 4.24
LC-2009-17 122.56 128.05 6.71 10.42